Understanding the Mathematics Behind StratePlan: Why Better Decisions Require a Different Computational Logic
Many investment and prioritization decisions appear to be a “list of projects.” Mathematically, however, they are something else: a combinatorial decision space that grows exponentially with each additional option. If you don’t model this space, you can’t optimize it.
Who is this page for?
- C-Level Executives & Boards of Directors: to understand why “good individual projects” do not automatically result in the best portfolio.
- CFOs/Controlling: to formally capture opportunity costs and constraints (budget, risk, ESG, capacity).
- Public Sector: to understand why funding logic, siloed thinking, and election cycles structurally lead to suboptimal portfolios.
The Core Problem: Decision Spaces Grow Exponentially
With each additional project, it’s not just “one more item” on a list, but a new dimension in the solution space. The number of possible portfolio combinations follows the 2n:
- 10 projects → 2^10 = 1,024 combinations
- 20 projects → 2^20 = 1,048,576 combinations
- 50 projects → 2^50 ≈ 1.125 quadrillion combinations
This is the point at which traditional committee processes, Excel logic, and heuristics reach a mathematical limit.
Local vs. Global Optimum
Local optimum means: a solution that performs better than obvious alternatives.
A global optimum means: the best solution across the entire decision space.
Many organizations improve local decisions (better scores, better business cases) without calculating the entire decision space. As a result, the best combinations often remain hidden.
Why Heuristics Are Structurally Incomplete
Typical rules and constraints from municipal and corporate decision-making processes—such as “Top 5 by NPV,” “IRR > WACC,” “Payback < 3 years,” or “strategic flagship projects first”—are operationally understandable. Mathematically, however, they have a weakness: they evaluate projects in isolation, rather than as an interdependent portfolio.
A project with a low individual value can, when combined with other projects, generate the greatest overall impact. A project with a high individual value can crowd out better combinations when restrictions are in place.
The solution: Formal modeling instead of gut feeling
Decision mathematics begins when a portfolio is formulated as a model:
- Decision variables:xi ∈ {0,1} (project is selected or not)
- Objective function: e.g., maximize total value, impact, NPV, utility index
- Constraints: budget, capacity, risk, CO₂, minimum quotas, dependencies, and many more...
A simple model (simplified)
Maximize:
∑ (Werti ×xi)
subject to:
∑ (Costi ×xi) ≤ Budget
∑ (Emissions ×xi) ≤ CO₂ limit
xi ∈ {0,1}
This basic principle corresponds to a (multi-)restrictive knapsack problem and forms the basis for real-world portfolio models with multiple dimensions and interdependencies.
What you’ll learn on this platform
- Why 2-ns is the true “invisible space” behind portfolio decisions
- How constraints dominate decisions (budget, capacity, ESG, risk)
- Why “prioritizing” is not the same as “optimizing”
- How opportunity costs can be made visible ex ante
- How data is transformed into a decision-ready model
Fundamentals: Decision Spaces & Optimization
The Mathematical Foundation: 2^n Local vs. Global Optima, Constraints, Objective Functions, and Model Logic
Math Deep Dive: The 5 Building Blocks That Really Matter
- Decision Variables: What options are available (xi)?
- Objective: What is being maximized (value, impact, NPV, utility)?
- Constraints: What limits the decision space (budget, CO₂, capacity, risk, quotas)?
- Interdependencies: Which projects enable or prevent others?
- Optimization: How is the best combination found within the entire space?
Projects do not disappear—they are better positioned and optimally scheduled over several years
In a mathematically optimized investment system, projects are not discarded. Instead, they are reprioritized, rescheduled, or strategically repositioned, so that, given budget, capacity, and risk constraints, they make the maximum economic contribution to the overall portfolio at the optimal time.
The key here is the multi-year perspective. Investment decisions are not made in isolation for a single year, but are optimized within the context of 2-, 3-, 5-, or 10-year plans.
Liquidity generated through optimization in the initial year is systematically carried over to the following year. This increases the available investment budget for the next period. This subsequent year is then optimized again.
The result: Projects can be brought forward as soon as they fit into the globally optimal portfolio under the new budget, capacity, and return conditions. This creates a dynamic multi-year optimization process in which each optimization period structurally improves the investment opportunities for subsequent years.
Final Thought
Those who do not calculate the decision space are merely managing complexity—not optimizing. Understanding mathematics here does not mean “learning formulas,” but rather modeling the structure of decisions in such a way that the global optimum can become visible at all.